Ongoing investments in capacity, technology, and
processes.


  • 75,000 m² of territory
  • 20,000+ m² total production &storage area
  • Free economic zone, long-term storage
  • Railway and motorway access to EU and CIS countries
  • Ice-free deepwater quay with a depth of 12m
  • Mobile 300-ton lifting and 2,000-ton skidding capacity
  • 160-ton overhead lifting capacity
  • 1250-ton press
  • Submerged arced welding portals
  • Robot welding station with a 50-ton positioner
  • Infrared and ceramic preheating
  • PWHT furnace (8×8×6m)
  • CNC boring mills with 24m horizontal and 8m vertical
    travel, and a 160-ton rotary table
  • Mobile circular mill with a 6.2m diameter
  • Mobile line-boring mills
  • Laser trackers
  • 10×10×35m blasting & painting halls
  • Large hydraulic power units (HPUs)
  • Load test stand (1,150-ton capacity)
  • Offshore crane test stand (6,000 tm)

Menu